Traverse Correction - Bowditch Method

Traverse Correction - Bowditch Method


In Traversing the lengths of the line are measured by chain or a tape and the directions are fixed by the compass or theodolite or by forming angles with chain and a tape. The latest instruments like total station captures the co-ordinates of the points along with elevations. These instruments are also capable of recording and string the distances and angles replacing the conventional methods.
There are two types of traverse surveying i.e. Closed Traverse and Open Traverse.
  1. Closed Traverse
    When a series of connected lines form a closed circuit, ie. When the finishing point coincides with the starting point, then it is called as a closed traverse. These closed traverse surveys has many applications like fixing the boundaries of ponds, forests etc..

  1. Open traverse :
    When a sequence of connected lines extends along a general direction and does not return to the starting point, it is known as ‘open traverse’ or ‘unclosed traverse’.

Traverse Correction Procedure
Present techniques used in traversing using total station as a open traverse. The steps are as described below…
  1. GPS pair points are fixed at a convenient distance, approximately about 3 to 5km. Care has to be taken that the pair of GPS points is fixed at a reliable distance (at least 60m is advised for better results) and on good monuments. These points are fixed in such a way that they are clearly inter visible and should cater for placing the total station firmly on the GPS stations,
  2. Total station is to be checked for its calibration, prism constants for the prisms to be set in the instrument to avoid errors.
  3. Total station is then used to conduct the traverse between the GPS points. This type of traverse ensures that the survey is started from a known pair of points and is closed on known pair of points. Care has to be taken that the last bearing is also taken for correcting the misclosures.
  4. There are several methods to correct the traverse misclosures. However, in most of the cases Bowditch rule is considered to be most reliable. The other methods like transit method, Crandall method, Least Square Methods are used very rarely. The most accurate method which is known as a misclosures correction by the least square method is used when the accuracy required is very high. This method finds itself applicable in the projects like tunnel works.
  1. Bowditch Rule
  2. Whole Circle Bearing
  3. Quandrantal Bearing

TOTAL STATION TRAVERSING ADJUSTMENT BY BOWDITCH METHOD

TOTAL STATION TRAVERSING ADJUSTMENT BY BOWDITCH METHOD


PROCEDURE FOR TRAVERSE CALCULATIONS

  • Adjust angles or directions
  • Determine bearings or azimuths
  • Calculate and adjust latitudes and departures
  • Calculate rectangular coordinates

DETERMINING BEARINGS OR AZIMUTHS

  • Requires the direction of at least one line within the traverse to be known or assumed
  • For many purposes, an assumed direction is sufficient
  • A magnetic bearing of one of the lines may be measured and used as the reference for determining the other directions
  • For boundary surveys, true directions are needed

LATITUDES AND DEPARTURES

Traverse Correction - Bowditch Method

Line
Dir
Deg
Min
Sec
Dir
Degrees
Length
Cumulative
Length
Azimuthal
Angles
Departure
Latitude
AB
N
26
10
0
E
N26.167E
285.1
285.1
26.167
+125.726
+255.881
BC
S
75
25
0
E
S75.417E
610.45
895.55
+104.583
+590.784
-153.700
CD
S
15
30
0
W
S15.5W
720.48
1616.03
+195.500
-192.540
-694.276
DE
N
1
42
0
W
N1.7W
203
1819.03
+358.300
-6.022
+202.911
EA
N
53
0
0
W
N53W
647.02
2466.05
+307.000
-516.733
+389.386

CLOSURE OF LATITUDES AND DEPARTURES

  • The algebraic sum of all latitudes must equal zero or the difference in latitude between the initial and final control points
  • The algebraic sum of all departures must equal zero or the difference in departure between the initial and final control points

ADJUSTMENT OF LATITUDES AND DEPARTURES


Line
Dir
Deg
Min
Sec
Dir
Length
Cumulative
Length
Azimuthal
Angles
Departure
Latitude
AB
N
26
10
0
E
285.1
285.1
26.167
+125.726
+255.881
BC
S
75
25
0
E
610.45
895.55
+104.583
+590.784
-153.700
CD
S
15
30
0
W
720.48
1616.03
+195.500
-192.540
-694.276
DE
N
1
42
0
W
203
1819.03
+358.300
-6.022
+202.911
EA
N
53
0
0
W
647.02
2466.05
+307.000
-516.733
+389.386
Correctioning Latitude 

ADJUSTED LATITUDES AND DEPARTURES


Line
Dir
Deg
Min
Sec
Dir
Length
Cumulative
Length
Azimuthal
Angles
Departure
Misclosure
Latitude
Misclosue
Corrected
Departure
Corrected
Latitude
AB
N
26
10
0
E
285.1
285.1
26.167
+0.140
+0.023
+125.586
+255.858
BC
S
75
25
0
E
610.45
895.55
+104.583
+0.301
+0.050
+590.483
-153.750
CD
S
15
30
0
W
720.48
1616.03
+195.500
+0.355
+0.059
-192.895
-694.335
DE
N
1
42
0
W
203
1819.03
+358.300
+0.100
+0.017
-6.122
+202.894
EA
N
53
0
0
W
647.02
2466.05
+307.000
+0.319
+0.053
-517.052
+389.334
                                                                                                                                                αCorr.Dep=0      αCorr.Lat=0
The Sum of total Corrected Departure and Sum of total Corrected latitude is 0.00, proves that the traverse is balanced

RECTANGULAR COORDINATES

  • Rectangular X and Y coordinates of any point give its position with respect to a reference coordinate system
  • Useful for determining length and direction of lines, calculating areas, and locating points
  • You need one starting point on a traverse (which may be arbitrarily defined) to calculate the coordinates of all other points
  • A large initial coordinate is often chosen to avoid negative values, making calculations easier.

CALCULATING X AND Y COORDINATES

Given the X and Y coordinates of any starting point A, the X and Y coordinates of the next point B are determined by:
Calculate XY

Line
Dir
Deg
Min
Sec
Dir
Length
Azimuthal
Angles
Calculated
Easting
Calculated
Northing
Adjusted
Easting
Corrected
Northing
AB
N
26
10
0
E
285.1
26.167
+5125.726
+10255.881
+5125.586
+10255.858
BC
S
75
25
0
E
610.45
+104.583
+5716.510
+10102.180
+5716.069
+10102.107
CD
S
15
30
0
W
720.48
+195.500
+5523.970
+9407.904
+5523.174
+9407.772
DE
N
1
42
0
W
203
+358.300
+5517.948
+9610.815
+5517.052
+9610.666
EA
N
53
0
0
W
647.02
+307.000
+5001.214
+10000.201
+5000.000
+10000.000

LINEAR MISCLOSURE

The hypotenuse of a right triangle whose sides are the misclosure in latitude and the misclosure in departure.
Linear_Misclosure

TRAVERSE PRECISION

  • The precision of a traverse is expressed as the ratio of linear misclosure divided by the traverse perimeter length.
  • expressed in reciprocal form
  • Example
0.89 / 2466.05 = 0.00036090
1 / 0.00036090 = 2770.8

Precision = 1/2771