CHECK ON CLOSED TRAVERSE
1. Check on angular measurements
(a) The sum of the measured interior angles should be equal to (2N – 4) x 900 where N is the number of sides of the traverse.
(b) The sum of the measured exterior angles should be equal to (2N + 4) x 900.
(c) The algebraic sum of the deflection angles should be equal to 3600.
Right-hand deflection is considered positive and left-hand deflection negative.
2. Check on linear measurement
(a) The lines should be measurement once each on two different days (along opposite directions). Both measurements should tally.
(b) Linear measurements should also be taken by the stadia method. The measurements by chaining and by the stadia method should tally.
No comments:
Post a Comment